-
Egypt project
Since 2009, Chint has been providing gas measurement system solutions and equipment to EGYPT GAS and TOWN GAS Gas Company in Egypt for 10 consecutive years, with a total number of 1.6 million units, covering more than 6 million people.Chint gas meter solutions help the Egyptian government to build a regional gas center to achieve energy-intensive transformations, and provide local gas companies with metering products to prevent theft and avoid losses to gas companies.
-
Thailand project
Chint provides AMI smart meter solutions for SRT (State Railway of Thailand), including smart meter, concentrator, PowerEasy AMI system, replacing the original mechanical energy meter, realizing remote power information collection, load control, energy analysis and other functions for users, solving the problem of timeless meter reading and manual work, high labor cost and difficulty in charging.
-
Columbia Project
Since 2010, Chint has been serving Colombian EPM, EPSA, EMCALI and other public utility companies with rich overseas project experience and excellent product quality, and has supplied over 500,000 power meters.
The single-phase electronic energy meter provided by Chint has accurate measurement and stable performance, and has solved a series of problems such as poor reliability of electricity, excessive non-technical line loss and serious electricity-stealing, which have been highly praised by power companies and users.
In addition to the products, Chint is responsible for technical support and on-site guidance for all projects, sharing the technology and experience it has acquired, and will be involved in projects such as electricity sales, smart grids and urban lighting in Colombia in the future. -
Transformation and Upgrading of the Smart Grid in Tajik
Since 2004, Chint has continued to serve the OSJIC BARKI TOJIK of the Tajik National Electricity Authority and Pamir Energy of the Tajik Pamir Power Authority, providing more than 300,000 single phase electric energy meters to assist Tajik and Pamir Power Bureau to complete the transformation and upgrading of the smart grid, solving the difficulties of reading and billing.
-
Pakistan Project
The rich features of Chint gas meter products help local governments reduce gas consumption and improve the safety for user gas.
-
Smart Prepayment Solutions in Rwanda & Malawi
Since 2017, Chint has provided smart prepaid solutions for the Rwanda Power Authority EDCL and the Malawi Power Authority ESCOM, including single phase smart din-rail meters, three phase smart energy meters, CIU, meter boxes and etc., achieving remote power data collection, power information monitoring, electricity theft alarm, power purchase and other functions for more than 60,000 residents and Industrial users. Chint help ESCOM and EDCL to reduce the power loss and solve the problem of electricity arrears.